Private Aviation

Ras Al Khaimah Starts Work on a VVIP Private Jet Terminal 15 Minutes From Wynn Al Marjan

Construction workers in high-visibility vests on the steel frame of a large aircraft hangar under construction in bright desert sunlight, with a crane overhead and a white business jet parked on a finished apron beside it

Ras Al Khaimah International Airport is getting a dedicated private aviation complex: a 1,500 square metre VVIP terminal, a hangar of about 8,000 square metres built for ultra-long-range business jets, and 9,000 square metres of apron, roughly 15 minutes from Wynn Al Marjan Island. Travels Dubai and Arabian Business reported on 13 and 14 November that construction has begun, with an opening now planned for summer 2027. If that date holds, the Northern Emirates gets its own purpose-built business aviation facility a few months before the UAE's first integrated casino resort opens next door.

What is being built

The project was announced at the Dubai Airshow in November 2025. According to WAM, the UAE state news agency, the airport signed an agreement with Falcon Executive Aviation, part of Dubai-based Alex Group Investment, to develop and operate a fixed base operation (FBO) at the airport. Falcon finances, builds, runs and maintains the facility under that agreement.

The published specification, consistent across WAM, Gulf News and Khaleej Times:

  • Terminal: 1,500 square metres, with one Royal lounge, four VVIP lounges and premium hospitality areas.
  • Hangar: about 8,000 square metres, described as multi-purpose, sized for large-cabin and ultra-long-range jets, with maintenance and operational support.
  • Apron: 9,000 square metres of apron and aircraft parking.
  • Airside extras: a helipad and space set aside for electric vertical take-off and landing (eVTOL) aircraft.

The sustainability brief is specific for a facility of this size. Falcon says the complex is designed to LEED Gold standard, with solar power expected to offset about 35% of its energy use, fully electric ground support equipment, compatibility with sustainable aviation fuel and an ambition of net-zero operational emissions. None of those targets has yet been independently certified, and no cost figure for the project has been published.

Two opening dates

The timeline has moved. At the November 2025 announcement, Gulf News, Khaleej Times and Falcon's own release gave about 15 months of construction and an opening in the first quarter of 2027. The November 2026 reports, citing the latest update from the developer, say the complex is scheduled to become operational in summer 2027.

The construction start currently rests on those two regional reports. AVNET found no separate confirmation from WAM or the Ras Al Khaimah Media Office at the time of writing, so the start date should be read as reported rather than officially announced. If work did begin this month, a summer 2027 opening implies a build of roughly eight to nine months, well short of the 15 months quoted a year ago. Either the scope has been phased, or the date will move again. Neither the airport nor Falcon has explained the change.

The operator

Alex Group Investment is not new to the business. Its chairman, Sultan Rashit Abdulla Rashit Al Shene, said at the launch that the Ras Al Khaimah facility complements the group's existing services at the Dubai Al Maktoum VIP Terminal. Falcon's own materials describe a charter arm, a private jet terminal operation, a maintenance unit that services its own and third-party aircraft, and flight support services, and the group lists helicopter operations at the Dubai Helipark among its recent news.

That combination matters for owners. An FBO run by a group that also handles maintenance and charter can offer hangarage and line support in one place, which is the service that has kept large-cabin aircraft concentrated at Dubai's Al Maktoum airport. Ras Al Khaimah does not yet appear among the five airports in AVNET's guide to UAE private aviation airports, and this facility is the first serious reason for it to be added.

Why Ras Al Khaimah, and why now

The answer is on Al Marjan Island. Wynn Resorts confirmed with its second-quarter 2026 results that Wynn Al Marjan Island will open in September 2027, with the project budget raised to about $5.7 billion, according to Gulf News. The resort plans more than 1,500 rooms and the UAE's first licensed casino, and in October it announced a 98-berth marina for yachts of up to 85 metres, covered in AVNET's report on Wynn Marina and its superyacht berths.

The guests that resort is built for are the same people who fly privately. Wynn describes the island as about 50 miles from Dubai International Airport. Landing at Ras Al Khaimah instead removes most of that road journey, and an operator with its own lounges, apron and hangar removes the need to share a general aviation ramp with commercial traffic.

Sheikh Salem bin Sultan bin Saqr Al Qasimi, Chairman of the Department of Civil Aviation and of Ras Al Khaimah International Airport, called the project a milestone in the emirate's emergence as a global destination. The emirate has set itself a target of more than 3.5 million visitors a year by 2030, Gulf News reported, and Travels Dubai reports that it recorded 1.35 million overnight visitors in 2025.

The airport is also planning beyond fixed-wing. Ras Al Khaimah is developing an air taxi network with Skyports, the vertiport operator, with initial operations targeted for 2027, and the FBO's eVTOL space is designed to connect to it. No routes, aircraft or fares have been published.

What to watch

  • Official confirmation of the start date. A statement from the airport or the Ras Al Khaimah Media Office would settle the timeline question.
  • The opening sequence. A summer 2027 terminal ahead of a September 2027 resort leaves little margin if either slips.
  • Handling rates and slot policy. Neither has been published. For operators comparing Ras Al Khaimah with Al Maktoum, these will decide whether the new terminal becomes a destination or an overflow.
  • Hangar demand. About 8,000 square metres of hangar is a large commitment for an airport that has not handled significant private traffic. Whether resident aircraft move north will show how far the Wynn effect reaches.

Stay Ahead With AVNET

Join thousands of industry professionals who trust AVNET to keep them informed and ahead in the fast-paced world of aviation, all in One Minute a Week newsletter.

Contact Us